Once the pool style
and size has been
selected, the site work is begun. The pool shape is marked
and then a backhoe will begin excavation.
|
The next step is to construct the steel walls and install the steps.
|
The shallow end is filled with packed sand
|
The
concrete is poured on the outside of the pool walls
|
Cement is poured into the shallow end.
|
Cement is poured into the deep end and the steel walls are backfilled.
|
The vinyl liner is installed and the
pool is filled with water.
|
The area for the patio deck is compacted and ready for cement
|
The deck is installed
|
It's
time to Get Wet with Fun Time Pools!
|